Diary details for September 2001 |
||
Date |
Item |
Time |
1/9/01 |
Starting the engine |
6:00 |
2/9/01 |
Squirting boiling water all over the garage |
2:30 |
6/9/01 |
Testing the large fan |
1:30 |
9/9/01 |
Sorting out electrics after engine start |
4:00 |
16/9/01 |
Back to the bodywork. |
4:00 |
27/9/01 |
Sorted horn air tube |
0:10 |
|
September 2001 total: |
18:10 |
in case you've got to this frame directly and can't get out, go here. |